
SOC Declaration - System Wide Draft
El Paso Natural Gas 3w ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP/TSP Name: 8001703-EL PASO NATURAL GAS CO. L.L.C. | Critical: Y |
Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
Notice Eff Date/Time: 09/03/2025 7:15:03AM | Notice End Date/Time: 09/04/2025 9:00:00am |
Post Date/Time: 9/3/2025 7:15:03 AM | Notice ID: 626013 |
Reqrd Rsp: 1 | Rsp Date: 09/03/2025 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: SOC Declaration - System Wide Draft |
STRAINED OPERATING CONDITION (SOC) Declaration - System Wide DRAFT
EFFECTIVE DATE: September 3, 2025
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: System-wide
OPERATING CONDITION SUMMARY: The EPNG system linepack is currently at 7,707 MMcf which is a decrease of 78 MMcf. The linepack draft is primarily due to deliveries in excess of scheduled volumes.
CUSTOMER ACTION REQUIRED: Customers are strongly encouraged to review their transport to ensure that their deliveries are in balance with their supplies and to ensure their scheduled supplies are performing as expected.
EPNG RESPONSE:
- Washington Ranch is on maximum operational withdrawal.
- Imbalance payback off the system, such as Payback (Imbalance Payback from TSP), will be denied due to operational concerns related to maintaining adequate linepack.
- IHSW Service will be suspended.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at media_relations@kindermorgan.com.
Dan English
EPNG Lead Controller
719-520-4722
TSP/TSP Name: 8001703-EL PASO NATURAL GAS CO. L.L.C. | Critical: Y |
Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
Notice Eff Date/Time: 09/03/2025 7:15:03AM | Notice End Date/Time: 09/04/2025 9:00:00am |
Post Date/Time: 9/3/2025 7:15:03 AM | Notice ID: 626013 |
Reqrd Rsp: 1 | Rsp Date: 09/03/2025 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: SOC Declaration - System Wide Draft |
STRAINED OPERATING CONDITION (SOC) Declaration - System Wide DRAFT
EFFECTIVE DATE: September 3, 2025
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: System-wide
OPERATING CONDITION SUMMARY: The EPNG system linepack is currently at 7,707 MMcf which is a decrease of 78 MMcf. The linepack draft is primarily due to deliveries in excess of scheduled volumes.
CUSTOMER ACTION REQUIRED: Customers are strongly encouraged to review their transport to ensure that their deliveries are in balance with their supplies and to ensure their scheduled supplies are performing as expected.
EPNG RESPONSE:
- Washington Ranch is on maximum operational withdrawal.
- Imbalance payback off the system, such as Payback (Imbalance Payback from TSP), will be denied due to operational concerns related to maintaining adequate linepack.
- IHSW Service will be suspended.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at media_relations@kindermorgan.com.
Dan English
EPNG Lead Controller
719-520-4722