Northbound High Utilization SPW TERMINATED
Enable Mississippi River Transmission 1d ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| Notice ID: | 59946 |
| Notice Type: | OPA |
| Critical: | Y |
| Notice Status Description: | |
| Reqrd Rsp Desc: | No Response Required |
| Response Date/Time: | |
| Posting Date/Time: | 2025-12-08 07:48:00.0 |
| Subject: | Northbound High Utilization SPW TERMINATED |
| Notice Effective Date/Time: | 2025-12-09 09:00:00.0 |
| Notice End Date/Time: | 2026-03-09 00:00:00.0 |
| Notice Text: |
New Information Posted 12/8/25 The Northbound High Utilization SPW is terminated effective 9:00
a.m., December 9th, 2025. Previous Information Posted 11/27/25 Due to the potential for maximum utilization of northbound firm
Main Line capacity causing a potential supply deficiency in the Market Zone,
MRT is issuing a System Protection Warning (SPW) effective 9:00 a.m. Sunday, November 30th,
2025, and continuing until further notice. During this time: 1)
MRT may not schedule any IT or AOR volumes
for delivery north of Perryville. 2)
Firm volumes may be limited to their
primary direction of flow within path on the system north of Perryville. 3)
MRT may not schedule volumes that result in
a daily short position in either the Market or Field Zones. 4)
The use of imbalance positions may not be
scheduled. 5)
Pool transfers will not be permitted from MRT’s Field Zone to its
Market Zone. 6)
The availability of non-ratable flows for
shippers who do not hold both northbound Main Line and Storage capacity may be
limited. 7)
Shippers with primary delivery points north of the Glendale
Compressor station and a receipt point that utilizes South to North
transportation, will be required to nominate and source all, or a portion of,
their total nomination at primary receipt points and/or at available Market
Zone supply locations, not to exceed applicable maximum receipt point
quantities in order to support their primary deliveries. 8)
Shippers
whose firm transportation contracts have Texas Gas Boardwalk (“Boardwalk”)
and/or EGT Olyphant (“Olyphant”) and/or Noark listed as primary receipt points,
must schedule the full amount of their primary receipt point quantity at each
of those points or, if the primary receipt point is Boardwalk and/or Olyphant,
at an alternative Main Line receipt point that is north of the primary receipt
point (Olyphant and/or Noark) if they desire to fully utilize their contract
MDQ. Shippers may elect to forego
nominating their full primary receipt point quantity at any/all of these
points, however, such Shipper’s maximum scheduled and confirmed contract
quantity shall be limited to their contract MDQ less any primary receipt point
quantity at Boardwalk and/or Olyphant and/or Noark that is not scheduled and
confirmed. Shippers whose deliveries are affected by any of the eight (8)
conditions above are encouraged to source supply at their primary receipt
points, MRT’s East Line, Madison Line, MoGas, or
reduce applicable delivery volumes. Failure to comply with this SPW may result in Shippers being issued an individual OFO. Nominations will be confirmed and scheduled in accordance with MRT’s Tariff. This SPW will be updated as more information becomes available. If you have any questions concerning this SPW, please contact
your Customer Solutions Representative. |
| Notice ID: | 59946 |
| Notice Type: | OPA |
| Critical: | Y |
| Notice Status Description: | |
| Reqrd Rsp Desc: | No Response Required |
| Response Date/Time: | |
| Posting Date/Time: | 2025-12-08 07:48:00.0 |
| Subject: | Northbound High Utilization SPW TERMINATED |
| Notice Effective Date/Time: | 2025-12-09 09:00:00.0 |
| Notice End Date/Time: | 2026-03-09 00:00:00.0 |
| Notice Text: |
New Information Posted 12/8/25 The Northbound High Utilization SPW is terminated effective 9:00
a.m., December 9th, 2025. Previous Information Posted 11/27/25 Due to the potential for maximum utilization of northbound firm
Main Line capacity causing a potential supply deficiency in the Market Zone,
MRT is issuing a System Protection Warning (SPW) effective 9:00 a.m. Sunday, November 30th,
2025, and continuing until further notice. During this time: 1)
MRT may not schedule any IT or AOR volumes
for delivery north of Perryville. 2)
Firm volumes may be limited to their
primary direction of flow within path on the system north of Perryville. 3)
MRT may not schedule volumes that result in
a daily short position in either the Market or Field Zones. 4)
The use of imbalance positions may not be
scheduled. 5)
Pool transfers will not be permitted from MRT’s Field Zone to its
Market Zone. 6)
The availability of non-ratable flows for
shippers who do not hold both northbound Main Line and Storage capacity may be
limited. 7)
Shippers with primary delivery points north of the Glendale
Compressor station and a receipt point that utilizes South to North
transportation, will be required to nominate and source all, or a portion of,
their total nomination at primary receipt points and/or at available Market
Zone supply locations, not to exceed applicable maximum receipt point
quantities in order to support their primary deliveries. 8)
Shippers
whose firm transportation contracts have Texas Gas Boardwalk (“Boardwalk”)
and/or EGT Olyphant (“Olyphant”) and/or Noark listed as primary receipt points,
must schedule the full amount of their primary receipt point quantity at each
of those points or, if the primary receipt point is Boardwalk and/or Olyphant,
at an alternative Main Line receipt point that is north of the primary receipt
point (Olyphant and/or Noark) if they desire to fully utilize their contract
MDQ. Shippers may elect to forego
nominating their full primary receipt point quantity at any/all of these
points, however, such Shipper’s maximum scheduled and confirmed contract
quantity shall be limited to their contract MDQ less any primary receipt point
quantity at Boardwalk and/or Olyphant and/or Noark that is not scheduled and
confirmed. Shippers whose deliveries are affected by any of the eight (8)
conditions above are encouraged to source supply at their primary receipt
points, MRT’s East Line, Madison Line, MoGas, or
reduce applicable delivery volumes. Failure to comply with this SPW may result in Shippers being issued an individual OFO. Nominations will be confirmed and scheduled in accordance with MRT’s Tariff. This SPW will be updated as more information becomes available. If you have any questions concerning this SPW, please contact
your Customer Solutions Representative. |