TC Energy Planned Maintenance Sept 05 - Sept 15, 2025

TransCanada Canadian Mainline 3w ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Notice Type
Maintenance

Effective Start Date Time
09/05/2025 5:00 am

Subject
TC Energy Planned Maintenance Sept 05 - Sept 15, 2025

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning September 5, 2025.            
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
  September 55445343022902405515
  September 65445343022902405365
  September 75445343022902405365
  September 85340343022902395380
  September 95340343022902395380
  September 105260343022902395910
  September 115260343022902395910
  September 125430343022902395910
  September 135430343022902395910
  September 145430343022902395910
  September 155030343022902395910

      Forecast system capabilities converted to energy at 38.5 MJ/m3.
  Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
  Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.  The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

  1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
  2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
  3Northern Ontario Line represents the flow east from Station 41.
  4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
  5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions.  If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.            

Notice Type
Maintenance

Effective Start Date Time
09/05/2025 5:00 am

Subject
TC Energy Planned Maintenance Sept 05 - Sept 15, 2025

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning September 5, 2025.            
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
  September 55445343022902405515
  September 65445343022902405365
  September 75445343022902405365
  September 85340343022902395380
  September 95340343022902395380
  September 105260343022902395910
  September 115260343022902395910
  September 125430343022902395910
  September 135430343022902395910
  September 145430343022902395910
  September 155030343022902395910

      Forecast system capabilities converted to energy at 38.5 MJ/m3.
  Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
  Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.  The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

  1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
  2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
  3Northern Ontario Line represents the flow east from Station 41.
  4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
  5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions.  If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.