Pipeline Operational Status for September 11, 2025 08:30 CCT

Westcoast Energy 2w ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

 

Westcoast Energy Limited Partnership

Critical Notice

Pipeline Operational Status

 

Notice:

 #59755

Revision: 

 #0

 

Subject:

Pipeline Operational Status for September 11, 2025 08:30 CCT

 

Summary:

       

System Linepack at 06:20 CCT:

3,312

  MMCF

 

Change Since Start of Gas Day September 10, 2025:

108

  MMCF

 

Target Linepack for Gas Day September 10, 2025:

3,000

  MMCF

 
 

System Status at Report Time:

High LinepackHigh Linepack

System-Wide OFO in Effect:

Yes

System-Wide

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 4%

Non-Suppliers:

Minimum 500 GJ - Maximum of 1% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 4%

Non-Suppliers:

Minimum 500 GJ - Maximum of 1% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

Linepack is expected to decrease today. Linepack on the FSJ Mainline is on-Target. Due to pipeline maintenance there is no physical flows between FTN and FSJ Mainlines. The FSJ Mainline is highly constrained and has very little tolerance for production variance from Nomination.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

September 10, 2025

 

September 11, 2025

Total System:

Receipts

(MMCF)

1,910

 

2,180

Deliveries

(MMCF)

1,823

 

2,139

 

Gordondale/Alliance:

Estimated Deliveries

(MMCF)

0

 

13

 

Gordondale/NOVA:

Estimated Deliveries

(MMCF)

199

 

227

Estimated Receipts

(MMCF)

0

 

0

 

Sunset Creek/NOVA:

Estimated Deliveries

(MMCF)

264

 

220

 

Sunset Creek/West:

Estimated Deliveries

(MMCF)

57

 

114

 

Huntingdon:

Estimated Flow Total

(MMCF)

1,212

 

1,366

Estimated Flow Export

(MMCF)

1,027

 

1,080

Authorized Business

(MMCF)

1,295

 

1,404

Pressure

(PSI)

635

 

635

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

A System Wide OFO is in effect for the duration of the Station #1 Westbound outage and shippers are reminded to keep accounts within tolerance to avoid any swing gas charges and/or business cuts. Tolerance levels have been changed to +/- 1% for non-supply shippers and +/- 4% for supply shippers. Shippers must ensure accounts are within tolerance.

 

Preliminary Imbalances at the end of Gas Day September 10, 2025:

Total Shipper Imbalances(GJ)

-63,422

Total OBA Imbalances(GJ)

354,258

System Gas on Pipe(GJ)

25,967

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 

Posting Date:11-Sep-2025 07:54 CCT
Effective Date:11-Sep-2025
End Date:11-Sep-2025
Response Date:N/A
Location:N/A
Contacts:N/A
 

Westcoast Energy Limited Partnership

Critical Notice

Pipeline Operational Status

 

Notice:

 #59755

Revision: 

 #0

 

Subject:

Pipeline Operational Status for September 11, 2025 08:30 CCT

 

Summary:

       

System Linepack at 06:20 CCT:

3,312

  MMCF

 

Change Since Start of Gas Day September 10, 2025:

108

  MMCF

 

Target Linepack for Gas Day September 10, 2025:

3,000

  MMCF

 
 

System Status at Report Time:

High LinepackHigh Linepack

System-Wide OFO in Effect:

Yes

System-Wide

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 4%

Non-Suppliers:

Minimum 500 GJ - Maximum of 1% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 4%

Non-Suppliers:

Minimum 500 GJ - Maximum of 1% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

Linepack is expected to decrease today. Linepack on the FSJ Mainline is on-Target. Due to pipeline maintenance there is no physical flows between FTN and FSJ Mainlines. The FSJ Mainline is highly constrained and has very little tolerance for production variance from Nomination.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

September 10, 2025

 

September 11, 2025

Total System:

Receipts

(MMCF)

1,910

 

2,180

Deliveries

(MMCF)

1,823

 

2,139

 

Gordondale/Alliance:

Estimated Deliveries

(MMCF)

0

 

13

 

Gordondale/NOVA:

Estimated Deliveries

(MMCF)

199

 

227

Estimated Receipts

(MMCF)

0

 

0

 

Sunset Creek/NOVA:

Estimated Deliveries

(MMCF)

264

 

220

 

Sunset Creek/West:

Estimated Deliveries

(MMCF)

57

 

114

 

Huntingdon:

Estimated Flow Total

(MMCF)

1,212

 

1,366

Estimated Flow Export

(MMCF)

1,027

 

1,080

Authorized Business

(MMCF)

1,295

 

1,404

Pressure

(PSI)

635

 

635

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

A System Wide OFO is in effect for the duration of the Station #1 Westbound outage and shippers are reminded to keep accounts within tolerance to avoid any swing gas charges and/or business cuts. Tolerance levels have been changed to +/- 1% for non-supply shippers and +/- 4% for supply shippers. Shippers must ensure accounts are within tolerance.

 

Preliminary Imbalances at the end of Gas Day September 10, 2025:

Total Shipper Imbalances(GJ)

-63,422

Total OBA Imbalances(GJ)

354,258

System Gas on Pipe(GJ)

25,967

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 

Posting Date:11-Sep-2025 07:54 CCT
Effective Date:11-Sep-2025
End Date:11-Sep-2025
Response Date:N/A
Location:N/A
Contacts:N/A