System Wide Notice Detail

TSP Name: EQUITRANS (TSP: 189569585)

8/10/2025 9:12 AM

Page 1 of 2

TSP Name / TSP:

EQUITRANS (189569585)

Post Date/Time:

07-09-2025 04:30:00 PM

Subject:

Plasma Compressor Station Maintenance 08-12-25

Notice Type:

PLANNED SERVICE OUTAGE/CAPACITY CONSTRAINT

Notice ID:

124939

Notice Status Description:

Initiate

Critical Notice Description:

Critical Notice

Notice Effective Date:

08-12-2025

Notice Effective Time:

12:00:00 AM

Notice End Date:

08-14-2025

Notice End Time:

11:59:00 PM

Required Response Indicator Description:

NO RESPONSE REQUIRED

System Wide Notice Detail

TSP Name: EQUITRANS (TSP: 189569585)

8/10/2025 9:12 AM

Page 2 of 2

Notice Text:

Equitrans L.P. will be performing maintenance at its Plasma Compressor Station in its Mainline Operational Area 3 beginning August 12, 2025,
Gas Day and continuing through August 14, 2025, Gas Day.

In conjunction with this maintenance, Operationally Available Capacity through the Plasma_OVC Meter will be reduced to the following Net
Delivered Operational Capacities:

August 12, 2025, Gas Day: 760,000 Dths

August 13, 2025, Gas Day: 760,000 Dths

August 14, 2025, Gas Day: 760,000 Dths

Scheduled Quantities will be adjusted to not exceed this amount. This amount is based on projected operating conditions and is subject to
change.

Net Delivered Dths are calculated by netting Receipt and Delivery Scheduled Quantities at the Plasma _OVC Meter listed above.

Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. Intraday
nomination changes may be permitted should the actual outage timeframe or level of impact differ from the estimates stated in this notification.

In addition, Customers may experience higher than normal pressures on the following pipelines in Mainline Operational Area 3 and Mainline
Operational Area 4: H-302, H-306, H-310, H-326, H-327, H-328 GSF-912, GSF-993, H-557, GSF-604, H-527, H-515, H-518, H-511, H-509, H-
508, H-111, and H-527.

Customers should monitor Equitrans’ Informational Postings Website for updates to this notice and applicable posted Operationally Available
Capacity.

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name: EQUITRANS (TSP: 189569585)
TSP Name / TSP:
EQUITRANS (189569585)
Post Date/Time:
07-09-2025 04:30:00 PM
Subject:
Plasma Compressor Station Maintenance 08-12-25
Notice Type:
PLANNED SERVICE OUTAGE/CAPACITY CONSTRAINT
Notice ID:
124939
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
08-12-2025
Notice Effective Time:
12:00:00 AM
Notice End Date:
08-14-2025
Notice End Time:
11:59:00 PM
Required Response Indicator Description:
NO RESPONSE REQUIRED
8/10/2025 9:12 AM
Page 1 of 2

System Wide Notice Detail
TSP Name: EQUITRANS (TSP: 189569585)
Notice Text:
Equitrans L.P. will be performing maintenance at its Plasma Compressor Station in its Mainline Operational Area 3 beginning August 12, 2025,
Gas Day and continuing through August 14, 2025, Gas Day.
In conjunction with this maintenance, Operationally Available Capacity through the Plasma_OVC Meter will be reduced to the following Net
Delivered Operational Capacities:
August 12, 2025, Gas Day: 760,000 Dths
August 13, 2025, Gas Day: 760,000 Dths
August 14, 2025, Gas Day: 760,000 Dths
Scheduled Quantities will be adjusted to not exceed this amount. This amount is based on projected operating conditions and is subject to
change.
Net Delivered Dths are calculated by netting Receipt and Delivery Scheduled Quantities at the Plasma _OVC Meter listed above.
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. Intraday
nomination changes may be permitted should the actual outage timeframe or level of impact differ from the estimates stated in this notification.
In addition, Customers may experience higher than normal pressures on the following pipelines in Mainline Operational Area 3 and Mainline
Operational Area 4: H-302, H-306, H-310, H-326, H-327, H-328 GSF-912, GSF-993, H-557, GSF-604, H-527, H-515, H-518, H-511, H-509, H-
508, H-111, and H-527.
Customers should monitor Equitrans’ Informational Postings Website for updates to this notice and applicable posted Operationally Available
Capacity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.