TSP Name:
EQUITRANS, L.P.
TSP:
189569585
Post Date/Time:
Thu Sep 04 07:00:00 GMT 2025
Subject:
H-152 Pipeline Maintenance (Groveton) 09-17-25
Notice Type:
OPERATIONAL FLOW ORDER/PLANNED SERVICE OUTAGE
Notice ID:
126530
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
09-17-2025
Notice Eff Time:
07:00:00
Notice End Date:
09-19-2025
Notice End Time:
23:59:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Equitrans L.P. will be performing pipeline maintenance on its H-152 pipeline in Mainline Operational Area 1 beginning at 7:00 AM ET on September 17,
2025. This maintenance will isolate the section of Equitrans pipeline system north of Meter # M5353173 (CPA Spartan IC) from the rest of the Equitrans
pipeline system and will impact the September 16, 2025, and September 17, 2025, Gas Days. As a result of this maintenance and in accordance with Sections
6.11 and 6.12 of the General Terms and Conditions of its FERC Gas Tariff, Equitrans is issuing an Operational Flow Order (OFO).
Equitrans L.P is hereby providing notice that all People’s Natural Gas Delivery/Receipt between Duff Road Valve Set (Coordinates 40.52648 / -80.12109)
and Groveton Valve Set (Coordinates 40.50824 / -80.13700) on the H-152 Pipeline must be shut in by 7:00 AM ET on September 17, 2025, and remain shut
in for the duration of the maintenance.
Additionally, beginning at 7:00 AM ET on September 17, 2025, and lasting until the completion of the maintenance:
All delivery points north of Meter # M5353173 (CPA Spartan IC) on the Equitrans system must be sourced from receipt Meter # 11221 (TGP-Bradford
Woods).
All other delivery points south of and including # M5353173 (CPA Spartan IC) on the Equitrans system must be sourced from receipt points other than Meter
# 11221 (TGP-Bradford Woods).
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Estimated time of outage is 16 hours. Customers should monitor Equitrans’ Informational Postings website for updates to this notice.
09-04-2025 07:00:00
Page 2 of 2
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name:
EQUITRANS, L.P.
TSP:
189569585
Post Date/Time:
Thu Sep 04 07:00:00 GMT 2025
Subject:
H-152 Pipeline Maintenance (Groveton) 09-17-25
Notice Type:
OPERATIONAL FLOW ORDER/PLANNED SERVICE OUTAGE
Notice ID:
126530
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
09-17-2025
Notice Eff Time:
07:00:00
Notice End Date:
09-19-2025
Notice End Time:
23:59:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Equitrans L.P. will be performing pipeline maintenance on its H-152 pipeline in Mainline Operational Area 1 beginning at 7:00 AM ET on September 17,
2025. This maintenance will isolate the section of Equitrans pipeline system north of Meter # M5353173 (CPA Spartan IC) from the rest of the Equitrans
pipeline system and will impact the September 16, 2025, and September 17, 2025, Gas Days. As a result of this maintenance and in accordance with Sections
6.11 and 6.12 of the General Terms and Conditions of its FERC Gas Tariff, Equitrans is issuing an Operational Flow Order (OFO).
Equitrans L.P is hereby providing notice that all People’s Natural Gas Delivery/Receipt between Duff Road Valve Set (Coordinates 40.52648 / -80.12109)
and Groveton Valve Set (Coordinates 40.50824 / -80.13700) on the H-152 Pipeline must be shut in by 7:00 AM ET on September 17, 2025, and remain shut
in for the duration of the maintenance.
Additionally, beginning at 7:00 AM ET on September 17, 2025, and lasting until the completion of the maintenance:
Notice Text:
All delivery points north of Meter # M5353173 (CPA Spartan IC) on the Equitrans system must be sourced from receipt Meter # 11221 (TGP-Bradford
Woods).
All other delivery points south of and including # M5353173 (CPA Spartan IC) on the Equitrans system must be sourced from receipt points other than Meter
# 11221 (TGP-Bradford Woods).
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Estimated time of outage is 16 hours. Customers should monitor Equitrans’ Informational Postings website for updates to this notice.