Equitrans Notice 125659
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
07-31-2025 11:45:00
Page 1 of 1
System Wide Notice Detail
TSP Name:
EQUITRANS LP
TSP:
189569585
Post Date/Time:
Thu Jul 31 11:45:00 GMT 2025
Subject:
H-128 and H-129 Pipeline River Dredging Project 08-11-25
Notice Type:
CRITICAL
Notice ID:
125659
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
07-31-2025
Notice Eff Time:
11:45:00
Notice End Date:
10-31-2025
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Equitrans L.P. is providing notice that in response to the Army Corp of Engineers U.S Army Corps of Engineers’ Monongahela River dredging project, a
section of its H-128 and H-129 Pipelines in Mainline Operational Area 2 will be isolated beginning at 10:00 AM ET on August 11, 2025, and is issuing an
OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.
In addition, People’s Natural Gas Delivery/Receipt Meter between and including The Walnut St. Valve set (Coordinates 40.190818/ -79.916289) and Liggett
Rd. Valve Set (Coordinates 40.201321 / -79.914893) on the H-129 and H-128 Pipelines must be shut in by 10:00 AM on August 11, 2025, and remain shut in
for the duration of the outage.
Lastly, in conjunction with this outage, Operational Capacity at Meter #M5397896 (Redd IC) will be reduced to 0 Dths for August 11, 2025, through August
14, 2025, Gas Days.
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Estimated duration of outage is 96 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when they
can turn back in-line.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name:
EQUITRANS LP
TSP:
189569585
Post Date/Time:
Thu Jul 31 11:45:00 GMT 2025
Subject:
H-128 and H-129 Pipeline River Dredging Project 08-11-25
Notice Type:
CRITICAL
Notice ID:
125659
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
07-31-2025
Notice Eff Time:
11:45:00
Notice End Date:
10-31-2025
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Equitrans L.P. is providing notice that in response to the Army Corp of Engineers U.S Army Corps of Engineers’ Monongahela River dredging project, a
section of its H-128 and H-129 Pipelines in Mainline Operational Area 2 will be isolated beginning at 10:00 AM ET on August 11, 2025, and is issuing an
OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.
In addition, People’s Natural Gas Delivery/Receipt Meter between and including The Walnut St. Valve set (Coordinates 40.190818/ -79.916289) and Liggett
Rd. Valve Set (Coordinates 40.201321 / -79.914893) on the H-129 and H-128 Pipelines must be shut in by 10:00 AM on August 11, 2025, and remain shut in
for the duration of the outage.
Lastly, in conjunction with this outage, Operational Capacity at Meter #M5397896 (Redd IC) will be reduced to 0 Dths for August 11, 2025, through August
14, 2025, Gas Days.
Notice Text:
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Estimated duration of outage is 96 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when they
can turn back in-line.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
07-31-2025 11:45:00
Page 1 of 1