Tennessee Gas Pipeline Notice 394673
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
Notice Eff Date/Time: 05/23/2025 11:10:27AM | Notice End Date/Time: 05/24/2025 9:00:00am |
Post Date/Time: 5/23/2025 11:10:27 AM | Notice ID: 394673 |
Reqrd Rsp: 1 | Rsp Date: 05/23/2025 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: RESTRICTIONS FOR 05-23-2025 ID1 |
Effective Intraday 1 Cycle (14:00) for the gas day of Friday, May 23, 2025 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 SYSTEM WIDE (EXCLUDING AREAS SOUTH OF STA 1 AND THE 500 LINE) FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR ALL BALANCING PARTIES
METER RESTRICTIONS
· GULFSTH/TGP Kiln Miss Exchange Hanc Delivery Meter (Pin 420383) - through 100% of SOP increases due to imbalance management quantity exceeded; 100 Dths
· Pine PRA/TGP Pine Prairie North Rap Delivery Meter (Pin 421043) - through 100% of SOP increases due to operational concerns; 5,000 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 85% of SIPss increases due to nominations in excess of operational capacity; 37,986 Dths
SEGMENT RESTRICTIONS
· STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 1,000 Dths
· STA 860 (Segment 860 BH) - through 100% of PIP increases due to force majeure at STA 860; 5,034 Dths
· STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,263 Dths
· STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 428,714 Dths
· MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 311,658 Dths
· STA 315 (Segment 315 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 367,748 Dths
· STA 321 (Segment 321 FH) - through approx 49% of SOP increases due to nominations in excess of operational capacity; 94,767 Dths
· MLV 330 (Segment 324 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 87,417 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 316,637 Dths
· STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 380,266 Dths
· STA 249 (Segment 249 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 188,805 Dths
LINEPACK RESTRICTIONS
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PALD service
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PAL-AO service
· Paybacks will be evaluated at each cycle and scheduled only if operationally feasible
STORAGE RESTRICTIONS
· No Authorized Overrun Injections Services under Rate Schedule FS-AO as well as No Authorized Overrun Injections in excess of Maximum Daily Injection Quantity (MDIQ) but below Maximum Daily Withdrawal Quantity (MDWQ) at the following storage fields:
· Northern MA (460018) storage field
· Portland MA (460025) storage field
· Portland PA (460020) storage field
· Bear Creek PA (460017) storage field
· No Interruptible Storage Injection Services under Rate Schedule IS at the following storage fields:
· Northern MA (460018) storage field (IS-MA)
· Bear Creek PA (460017) storage field (IS-PA)
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
Notice Eff Date/Time: 05/23/2025 11:10:27AM | Notice End Date/Time: 05/24/2025 9:00:00am |
Post Date/Time: 5/23/2025 11:10:27 AM | Notice ID: 394673 |
Reqrd Rsp: 1 | Rsp Date: 05/23/2025 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: RESTRICTIONS FOR 05-23-2025 ID1 |
Effective Intraday 1 Cycle (14:00) for the gas day of Friday, May 23, 2025 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 SYSTEM WIDE (EXCLUDING AREAS SOUTH OF STA 1 AND THE 500 LINE) FOR OVER-DELIVERIES INTO THE SYSTEM OR UNDER-TAKES OUT OF THE SYSTEM FOR ALL BALANCING PARTIES
METER RESTRICTIONS
· GULFSTH/TGP Kiln Miss Exchange Hanc Delivery Meter (Pin 420383) - through 100% of SOP increases due to imbalance management quantity exceeded; 100 Dths
· Pine PRA/TGP Pine Prairie North Rap Delivery Meter (Pin 421043) - through 100% of SOP increases due to operational concerns; 5,000 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 85% of SIPss increases due to nominations in excess of operational capacity; 37,986 Dths
SEGMENT RESTRICTIONS
· STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 1,000 Dths
· STA 860 (Segment 860 BH) - through 100% of PIP increases due to force majeure at STA 860; 5,034 Dths
· STA 523 West (Segment 516 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,263 Dths
· STA 307 (Segment 307 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 428,714 Dths
· MLV 314 East (Segment 314 BH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 311,658 Dths
· STA 315 (Segment 315 BH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 367,748 Dths
· STA 321 (Segment 321 FH) - through approx 49% of SOP increases due to nominations in excess of operational capacity; 94,767 Dths
· MLV 330 (Segment 324 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 87,417 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 316,637 Dths
· STA 245 (Segment 245 FH) - through approx 97% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 380,266 Dths
· STA 249 (Segment 249 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 188,805 Dths
LINEPACK RESTRICTIONS
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PALD service
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PAL-AO service
· Paybacks will be evaluated at each cycle and scheduled only if operationally feasible
STORAGE RESTRICTIONS
· No Authorized Overrun Injections Services under Rate Schedule FS-AO as well as No Authorized Overrun Injections in excess of Maximum Daily Injection Quantity (MDIQ) but below Maximum Daily Withdrawal Quantity (MDWQ) at the following storage fields:
· Northern MA (460018) storage field
· Portland MA (460025) storage field
· Portland PA (460020) storage field
· Bear Creek PA (460017) storage field
· No Interruptible Storage Injection Services under Rate Schedule IS at the following storage fields:
· Northern MA (460018) storage field (IS-MA)
· Bear Creek PA (460017) storage field (IS-PA)
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.