Transco Pipeline Notice 16050059
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Critical: | Y |
Notice Eff Date: | 09/16/2025 |
Notice Eff Time: | 11:58:59 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 16050059 |
Notice Stat Desc: | Initiate |
Notice Type Desc: | Maint |
Post Date: | 09/16/2025 |
Post Time: | 11:58:59 CDT |
Prior Notice: | 0 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Jobs #748348 & #670865 Station 195 Planned Outage and Maintenance Summary
Transco will conduct a scheduled station outage for electrical maintenance and inspections under Job #748348, along with a line outage to complete planned anomaly digs for system integrity monitoring associated with Job #670865, as outlined in the 2025 Planned Outage and Maintenance Summary. The current schedule for this combined maintenance is October 13, 2025, through November 4, 2025.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through the location may not be available.
Operating Conditions resulting from this work will also require Transco to manage primary-firm transportation services moving north to south through the TSB location listed below. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through this location will not be impacted.
The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1674 (Station 195) will be used to manage capacity availability including any required changes to the expected total quantity available during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of primary-firm transportation services during the indicated period.
TSB Name – Location |
Location ID |
Flow Direction |
Station 195 MP 1674 |
9012103 |
North to South |
Pipeline Maintenance |
Estimated Outage |
Design Capacity (Mdt/d) |
Total Primary-Firm Quantity Available (Mdt/d) |
%Cuts (of Design Capacity) |
%Cuts (Primary) – Shipper Impact (Based on Historic Utilization)
|
% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization) |
Station 195 Outage |
October 13-17 |
2,777 |
2,200 |
20% |
0-10% |
0-10% |
MLB Outage |
October 18 -November 4 |
2,777 |
2,400 |
13% |
0-5% |
0-5% |