Adding proxy2: 8075 WBI Energy Transmission Notice 7917 - API PipeRiv

Currently viewing the dev server.

WBI Energy Transmission Notice 7917

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

- Detail
TSP/TSP Name: 131537896 - WBI Energy Transmission, Inc.
Notice ID: 7917
Notice Type: Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Post D/T: 6/18/2025 @ 8:31 PM
Notice Eff D/T: 6/19/2025 @ 9:00 AM
Notice End D/T: 6/20/2025 @ 9:00 AM
Reqrd Rsp Desc: No response required
Rsp D/T:

Subject: Capacity Constraint, 6/19/2025
Notice Text: Gas Day: 6/19/2025, Cycle: Evening. The following locations and/or line sections are in a critical situation. Penalties will be imposed at the following locations and/or all locations within the line sections:
Location(s):
01950 VGT-Felton (D); Capacity Constraint

*** All references to Time are stated for the Central Time Zone.
- Detail
TSP/TSP Name: 131537896 - WBI Energy Transmission, Inc.
Notice ID: 7917
Notice Type: Constraint
Notice Stat Desc: Initiate
Prior Notice:
Critical: Y
Post D/T: 6/18/2025 @ 8:31 PM
Notice Eff D/T: 6/19/2025 @ 9:00 AM
Notice End D/T: 6/20/2025 @ 9:00 AM
Reqrd Rsp Desc: No response required
Rsp D/T:

Subject: Capacity Constraint, 6/19/2025
Notice Text: Gas Day: 6/19/2025, Cycle: Evening. The following locations and/or line sections are in a critical situation. Penalties will be imposed at the following locations and/or all locations within the line sections:
Location(s):
01950 VGT-Felton (D); Capacity Constraint

*** All references to Time are stated for the Central Time Zone.