System Linepack at 15:35 CCT: |
2,991 |
MMCF |
|
Change Since Start of Gas Day September 03, 2025: |
-67 |
MMCF |
|
Target Linepack for Gas Day September 03, 2025: |
3,000 |
MMCF |
|
|
System Status at Report Time: |
 | Low Linepack | Low Linepack |
|
|
System-Wide OFO in Effect: | Yes | System-Wide | Pack Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 4% | Non-Suppliers: | Minimum 500 GJ - Maximum of 1% up to 5,000 GJ | Marketers: | Mandatory zero balance | Draft Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 4% | Non-Suppliers: | Minimum 500 GJ - Maximum of 1% up to 5,000 GJ | Marketers: | Mandatory zero balance | |
|
Physical Operations Notes: |
Linepack is expected to decrease today. Due to pipeline maintenance there is no physical flows between FTN and FSJ Mainlines. |
|
|
Operational Status Details: |
|
Report for Gas Day |
|
Forecast for Gas Day |
|
September 03, 2025 |
|
September 04, 2025 |
No details available for this Operational Status. |
|
Pipeline Status: |
|
Mainline North |
|
|
Mainline Central |
|
|
Mainline South |
|
|
Commercial Notes: |
A System Wide OFO is in effect for the duration of the Station #1 Westbound outage and shippers are reminded to keep accounts within tolerance to avoid any swing gas charges and/or business cuts. Tolerance levels have been changed to +/- 1% for non-supply shippers and +/- 4% for supply shippers. Shippers must ensure accounts are within tolerance. |
|
Estimated Imbalances at the end of Gas Day September 02, 2025: |
Total Shipper Imbalances(GJ) |
-118,524 |
|
Total OBA Imbalances(GJ) |
54,994 |
|
System Gas on Pipe(GJ) |
21,478 |
|
|
A negative imbalance is owed to the Pipeline. |
|
The above information is a forecast based on variable factors and as a result can
change once actual data is validated.
If you have any questions, please call the CSR hotline at (403) 699-1800
|