System Linepack at 15:35 CCT: |
3,183 |
MMCF |
|
Change Since Start of Gas Day September 11, 2025: |
-128 |
MMCF |
|
Target Linepack for Gas Day September 11, 2025: |
3,000 |
MMCF |
|
|
System Status at Report Time: |
 | High Linepack | High Linepack |
|
|
System-Wide OFO in Effect: | Yes | System-Wide | Pack Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 4% | Non-Suppliers: | Minimum 500 GJ - Maximum of 1% up to 5,000 GJ | Marketers: | Mandatory zero balance | Draft Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 4% | Non-Suppliers: | Minimum 500 GJ - Maximum of 1% up to 5,000 GJ | Marketers: | Mandatory zero balance | |
|
Physical Operations Notes: |
Linepack is expected to decrease today. Linepack on the FSJ Mainline is on-Target. Due to pipeline maintenance there is no physical flows between FTN and FSJ Mainlines. The FSJ Mainline is highly constrained and has very little tolerance for production variance from Nomination. |
|
|
Operational Status Details: |
|
Report for Gas Day |
|
Forecast for Gas Day |
|
September 11, 2025 |
|
September 12, 2025 |
No details available for this Operational Status. |
|
Pipeline Status: |
|
Mainline North |
|
|
Mainline Central |
|
|
Mainline South |
|
|
Commercial Notes: |
A System Wide OFO is in effect for the duration of the Station #1 Westbound outage and shippers are reminded to keep accounts within tolerance to avoid any swing gas charges and/or business cuts. Tolerance levels have been changed to +/- 1% for non-supply shippers and +/- 4% for supply shippers. Shippers must ensure accounts are within tolerance. |
|
Estimated Imbalances at the end of Gas Day September 10, 2025: |
Total Shipper Imbalances(GJ) |
-63,422 |
|
Total OBA Imbalances(GJ) |
327,341 |
|
System Gas on Pipe(GJ) |
5,255 |
|
|
A negative imbalance is owed to the Pipeline. |
|
The above information is a forecast based on variable factors and as a result can
change once actual data is validated.
If you have any questions, please call the CSR hotline at (403) 699-1800
|