March 6, 2018

Cameron System Pipeline Condition – Update #1

Force Majeure Notice Termination

Kinetica Energy Express (KEE) has implemented a solution to provide power to enable deliveries to

downstream markets on the Cameron System (purchase power is still out in Cameron Parish).

The force majeure notice (KEE notice #749) is being terminated effective ID2 for gas day March 6, 2018.

KEE Gas Control is cal ing producers on the Cameron System notifying them to bring production back on-

line.

Nominations for ID2 and ID3 on gas day March 6, 2018 wil be scheduled in full for production that is

flowing at the time the cycle is confirmed.

Timely and Evening cycles for gas day March 7, 2018 wil be scheduled based on nominations.

To maintain system integrity and normal operating pressures, shippers are advised to schedule volumes

that closely reflect actual receipts into the Cameron System.

The list of receipt points on the Cameron System are provided in the table below.

For questions about nominations, please contact the Gas Scheduling Representative at (713) 228-3347

x420. After hours please contact the on-call scheduler (posted on the EBB).

Meter

Number Description

Meter

Number Description

Meter

Number Description

10210

GRAND CHENIER DEHY

11426

WC BLK 65A DEHY

12718

WHITE LAKE

10223

HOG BAYOU DEHY

11665

WC BLK 66 E WELL

12731

CAMERON PARISH

10506

EC BLK 71

12056

LAKE ARTHUR DEHY

12745

LITTLE PECAN ISLAND: RIP 507A 118

10509

WC BLK 192A

12164

PIONEER LAKE ARTHRU DEHY

12761

EC BLK 2C:RIP 507A 2300

10510

WC BLK 192B

12559

W CAM BLK 167

12810

EC BLCK 65D:RIP 507A 126

10734

HACKBERRY DEHY

12569

E CAM BLK 2A

12885

DOLAND No. 1

11141

GIBBSTOWN DEHY

12627

WC 73A

14005

SOUTH LAKE ARTHUR

12633 LAC BLANC 3

14006

Miami Corp

March 6, 2018
Cameron System Pipeline Condition – Update #1
Force Majeure Notice Termination

Kinetica Energy Express (KEE) has implemented a solution to provide power to enable deliveries to
downstream markets on the Cameron System (purchase power is still out in Cameron Parish).
The force majeure notice (KEE notice #749) is being terminated effective ID2 for gas day March 6, 2018.
KEE Gas Control is cal ing producers on the Cameron System notifying them to bring production back on-
line.
Nominations for ID2 and ID3 on gas day March 6, 2018 wil be scheduled in full for production that is
flowing at the time the cycle is confirmed.
Timely and Evening cycles for gas day March 7, 2018 wil be scheduled based on nominations.
To maintain system integrity and normal operating pressures, shippers are advised to schedule volumes
that closely reflect actual receipts into the Cameron System.
The list of receipt points on the Cameron System are provided in the table below.

Meter
Meter
Number Description
Number Description
Meter
Number Description
10210
GRAND CHENIER DEHY
11426
WC BLK 65A DEHY
12718
WHITE LAKE
10223
HOG BAYOU DEHY
11665
WC BLK 66 E WELL
12731
CAMERON PARISH
10506
EC BLK 71
12056
LAKE ARTHUR DEHY
12745
LITTLE PECAN ISLAND: RIP 507A 118
10509
WC BLK 192A
12164
PIONEER LAKE ARTHRU DEHY 12761
EC BLK 2C:RIP 507A 2300
10510
WC BLK 192B
12559
W CAM BLK 167
12810
EC BLCK 65D:RIP 507A 126
10734
HACKBERRY DEHY
12569
E CAM BLK 2A
12885
DOLAND No. 1
11141
GIBBSTOWN DEHY
12627
WC 73A
14005
SOUTH LAKE ARTHUR
12633 LAC BLANC 3
14006
Miami Corp


For questions about nominations, please contact the Gas Scheduling Representative at (713) 228-3347
x420. After hours please contact the on-call scheduler (posted on the EBB).