Adding proxy2: 8451 ETC Tiger Pipeline Operationally Available Capacity - API PipeRiv

Currently viewing the dev server.

ETC Tiger Pipeline Operationally Available Capacity

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Set Up Email Notifications
ID Loc Flow QTI Zone DC OPC TSQ OAC IT All Reason
78542 ANR D DPQ EAST OF HWY 789 500,000 500,000 235,647 264,353 N Y
79038 ARCADIA GAS STORAGE D DPQ EAST OF HWY 789 250,000 265,000 23,800 241,200 Y Y
79039 CADEVILLE GAS STORAGE D DPQ EAST OF HWY 789 250,000 265,000 47,320 217,680 N Y
78527 CARTHAGE HUB D DPQ WEST OF HWY 789 1,300,000 1,300,000 40,244 1,259,756 N Y
78555 COLUMBIA GULF D DPQ EAST OF HWY 789 1,300,000 1,300,000 279,097 1,020,903 Y Y
79060 HODGE PAPER MILL D DPQ EAST OF HWY 789 30,000 30,000 21,500 8,500 N Y
78543 SESH D DPQ EAST OF HWY 789 1,300,000 0 0 0 N N Total Scheduled Quantity at associated locations;Operating Capacity at associated locations;Operationally Available Capacity at associated locations
79007 SESH - SPECTRA D DPQ EAST OF HWY 789 0 867,000 485,813 381,187 N N Design Capacity at measurement location
79006 SESH-SNG D DPQ EAST OF HWY 789 0 433,000 228,690 204,310 N N Design Capacity at measurement location
78538 TENNESSEE GAS PIPELINE D DPQ EAST OF HWY 789 265,000 265,000 8,045 256,955 N Y
78536 TEXAS EASTERN D DPQ EAST OF HWY 789 140,000 140,000 0 140,000 N Y
78540 TEXAS GAS TRANSMISSION D DPQ EAST OF HWY 789 500,000 500,000 114,773 385,227 N Y
100728 TGP Delhi D DPQ EAST OF HWY 789 650,000 650,000 75,476 574,524 N Y
78541 TRUNKLINE GAS PIPELINE D DPQ EAST OF HWY 789 525,000 525,000 43,552 481,448 N Y