TSP Name: EUREKA

8/6/2025 8:50 PM

Page 1 of 1

TSP Name / TSP:

EUREKA

Post Date/Time:

06-06-2025 12:30:00 PM

Subject:

Zink Compressor Station Maintenance [07-08-25]

Notice Type:

CRITICAL

Notice ID:

41926

Notice Status Description:

Initiate

Critical Notice Description:

Critical Notice

Notice Effective Date:

06-06-2025

Notice Effective Time:

12:30:00 PM

Notice End Date:

09-30-2025

Notice End Time:

12:00:00 AM

Required Response Indicator Description:

Notice Text:

Station impacting deliveries to its downstream interconnects on the July 08, 2025, Gas Day.

In conjunction with this maintenance, Operationally Available Capacity is reduced to a combined nomination total of 717,000 DTH at the REX
Interconnect, Meter #60059 (Eureka Cameron) and LXP Interconnect Meter #743103 for the July 08, 2025, Gas Day. All operators with
production flowing to Zink Compressor Station should expect to see higher than normal line pressure and a possible reduction in flow to receipts.
Nominations should be adjusted accordingly.

Nominations at Delivery Meter # 743103 (LXP-Eureka) from the EM-ORS Receipt IC (Meter # 10057) will not be impacted by this maintenance.

Nominations will be scheduled to not exceed the aforementioned amounts. These amounts are based on projected operating conditions and are
subject to change.

Should specific shut-ins be required, Equitrans Midstream will notify impacted parties.

Customers should monitor EQM Midstream Partners, LP – Gathering Informational Postings Website for updates to this notice.
*For production operations, Zink Compressor Station throughput will be reduced to 680 MMCFD for the July 08, 2025, Gas Day.

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name: EUREKA
TSP Name / TSP:
EUREKA
Post Date/Time:
06-06-2025 12:30:00 PM
Subject:
Zink Compressor Station Maintenance [07-08-25]
Notice Type:
CRITICAL
Notice ID:
41926
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
06-06-2025
Notice Effective Time:
12:30:00 PM
Notice End Date:
09-30-2025
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
Notice Text:
Station impacting deliveries to its downstream interconnects on the July 08, 2025, Gas Day.
In conjunction with this maintenance, Operationally Available Capacity is reduced to a combined nomination total of 717,000 DTH at the REX
Interconnect, Meter #60059 (Eureka Cameron) and LXP Interconnect Meter #743103 for the July 08, 2025, Gas Day. All operators with
production flowing to Zink Compressor Station should expect to see higher than normal line pressure and a possible reduction in flow to receipts.
Nominations should be adjusted accordingly.
Nominations at Delivery Meter # 743103 (LXP-Eureka) from the EM-ORS Receipt IC (Meter # 10057) will not be impacted by this maintenance.
Nominations will be scheduled to not exceed the aforementioned amounts. These amounts are based on projected operating conditions and are
subject to change.
Should specific shut-ins be required, Equitrans Midstream will notify impacted parties.
Customers should monitor EQM Midstream Partners, LP – Gathering Informational Postings Website for updates to this notice.
*For production operations, Zink Compressor Station throughput will be reduced to 680 MMCFD for the July 08, 2025, Gas Day.