Equitrans Gathering Critical Notices

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Type Posted Effective End Identifier Status Subject Response
CRITICAL 08/07/25 08/07/25 11/30/25 43346 Carbide Compressor Station Unplanned Maintenance Update (High Pressure) (08.07.2025) Completed
CRITICAL 08/07/25 08/07/25 11/30/25 43286 Carbide Compressor Station Unplanned Maintenance Update (High Pressure) (08.07.2025)
CRITICAL 08/07/25 08/07/25 11/30/25 43267 Cain Ridge Compressor Station Maintenance [08-06-25] COMPLETE
CRITICAL 08/07/25 08/07/25 11/30/25 43266 Pisces Compressor Station Planned Outage Complete (High Pressure)(08.06.2025)
CRITICAL 08/05/25 08/05/25 11/30/25 43206 Carbide Compressor Station Planned Maintenance (High Pressure) (09.18.2025)
CRITICAL 07/31/25 07/31/25 09/30/25 43146 Carbide Compressor Station Planned Maintenance (High Pressure) (09.09.2025)
CRITICAL 07/30/25 07/30/25 10/31/25 43086 Eureka-Gallaher Lean IC Maintenance [7-29-25] COMPLETE
CRITICAL 07/28/25 07/28/25 09/30/25 43067 Carbide Compressor Station Capacity Constraint Update (High Pressure)(06.19.2025)
CRITICAL 07/28/25 07/28/25 10/31/25 43066 ERS Planned Pipeline Pigging Canceled (High Pressure)(07.29.2025-07.31.2025)
CRITICAL 07/28/25 07/28/25 10/31/25 43046 Zink Compressor Station Unplanned Outage [7-25-25] COMPLETE
CRITICAL 07/25/25 07/25/25 10/31/25 43026 Zink Compressor Station Unplanned Outage [7-25-25]
CRITICAL 07/24/25 07/24/25 10/31/25 42986 TETCO-Bambino Interconnect Maintenance [07-24-25] COMPLETE
CRITICAL 07/24/25 07/24/25 10/31/25 42966 Carbide Compressor Station Planned Maintenance (High Pressure)(08.07.2025)
CRITICAL 07/24/25 07/24/25 10/31/25 42946 Carbide Compressor Station Planned Maintenance (High Pressure)(09.02.2025)
CRITICAL 07/23/25 07/23/25 10/31/25 42886 Cain Ridge Compressor Station Maintenance [08-26-25]
CRITICAL 07/18/25 07/18/25 10/31/25 42826 Pisces Compressor Station Planned Outage Update (High Pressure)(08.06.2025)
CRITICAL 07/16/25 07/16/25 10/31/25 42786 Carbide Compressor Station Unplanned Maintenance Completed (High Pressure) (07.14.2025)
CRITICAL 07/16/25 07/16/25 10/31/25 42766 Zink Compressor Station Maintenance [08-19-25]
CRITICAL 07/16/25 07/16/25 10/31/25 42746 Cain Ridge Compressor Station Maintenance [07-15-25] COMPLETE
CRITICAL 07/15/25 07/15/25 10/31/25 42706 Carbide Compressor Station Unplanned Maintenance Update (High Pressure) (07.14.2025)
CRITICAL 07/14/25 07/14/25 10/31/25 42686 Carbide Compressor Station Planned Maintenance (Low Pressure) (08.12.2025 and 08.13.2025)
CRITICAL 07/14/25 07/14/25 10/31/25 42666 Carbide Compressor Station Unplanned Maintenance (High Pressure) (07.14.2025)
CRITICAL 07/09/25 07/09/25 10/31/25 42646 WG-100 Planned Pipeline Pigging Completed (High Pressure)(07.09.25)
CRITICAL 07/09/25 07/09/25 10/31/25 42626 Zink Compressor Station Maintenance [07-08-25] COMPLETE
CRITICAL 07/08/25 07/08/25 10/31/25 42606 Rover-Clarington Interconnect Maintenance [08-20-25]
CRITICAL 07/02/25 07/02/25 10/31/25 42546 Cain Ridge Compressor Station Maintenance [08-06-25]
CRITICAL 07/02/25 07/02/25 10/31/25 42526 TETCO-Bambino Interconnect Maintenance [07-24-25]
CRITICAL 07/02/25 07/02/25 10/31/25 42506 ERS Planned Pipeline Pigging Completed (High Pressure) (07.01.25 - 07.03.25)
CRITICAL 07/01/25 07/01/25 10/31/25 42486 WG-100 Planned Pipeline Pigging (High Pressure)(07.09.25)
CRITICAL 06/27/25 06/27/25 09/30/25 42466 Eureka-Gallaher Lean IC Maintenance [7-29-25]
CRITICAL 06/27/25 06/27/25 09/30/25 42446 Carbide Compressor Station Planned Maintenance Complete (High Pressure) (06.26.2025)
CRITICAL 06/24/25 06/24/25 09/30/25 42346 EGTS-Lowman Ridge IC Maintenance Complete (High Pressure)(05.16.25-05.26.2025)
CRITICAL 06/20/25 06/20/25 09/30/25 42286 EGTS-Lowman Ridge IC Update III (High Pressure)(05.16.25-05.26.2025)
CRITICAL 06/19/25 06/19/25 09/30/25 42266 Carbide Compressor Station Capacity Constraint (High Pressure)(06.19.2025)
CRITICAL 06/18/25 06/18/25 09/30/25 42226 Godzilla Compressor Station Maintenance [06-18-25] COMPLETE
CRITICAL 06/18/25 06/18/25 09/30/25 42206 Fortress Compressor Station Maintenance [06-18-25] COMPLETE
CRITICAL 06/18/25 06/18/25 09/30/25 42186 ERS Planned Pipeline Pigging Completed (High Pressure)(06.17.2025-06.19.2025)
CRITICAL 06/18/25 06/18/25 09/30/25 42166 Carbide Compressor Station Planned Maintenance Completed (High Pressure)(06.17.2025)
CRITICAL 06/12/25 06/12/25 09/30/25 42126 EGTS-California 342 Interconnect Maintenance [06-11-25] COMPLETE
CRITICAL 06/12/25 06/12/25 09/30/25 42086 EGTS-Lowman Ridge IC Update II (High Pressure)(05.16.25-05.26.2025)
CRITICAL 06/12/25 06/12/25 09/30/25 42046 Goliath Compressor Station Maintenance [06-11-25] COMPLETE
CRITICAL 06/12/25 06/12/25 09/30/25 42026 Titan Compressor Station Maintenance [06-11-25] COMPLETE
CRITICAL 06/12/25 06/12/25 09/30/25 42006 Cobra Compressor Station Maintenance [06-11-25] COMPLETE
CRITICAL 06/11/25 06/11/25 09/30/25 41986 Pisces Compressor Station Planned Outage (High Pressure)(08.06.2025)
CRITICAL 06/11/25 06/11/25 09/30/25 41967 Carbide Compressor Station Planned Maintenance Complete (High Pressure)(06.10.25)
CRITICAL 06/11/25 06/11/25 09/30/25 41966 Cain Ridge Compressor Station Maintenance [06-10-25] COMPLETE
CRITICAL 06/06/25 06/06/25 09/30/25 41946 Cain Ridge Compressor Station Maintenance [07-15-25]
CRITICAL 06/06/25 06/06/25 09/30/25 41926 Zink Compressor Station Maintenance [07-08-25]
CRITICAL 06/05/25 06/05/25 08/31/25 41886 EGTS-California 342 Interconnect Maintenance [06-02-25] COMPLETE
CRITICAL 06/05/25 06/05/25 09/30/25 41866 Carbide CS Unplanned Outage Completed (High Pressure) (06.01.2025)
CRITICAL 06/04/25 06/04/25 09/30/25 41846 Cain Ridge Compressor Station Maintenance [06-03-25] Complete
CRITICAL 06/01/25 06/01/25 09/30/25 41806 Carbide Compressor Station Unplanned Maintenance (High Pressure) (06.01.2025)
CRITICAL 05/29/25 05/29/25 08/31/25 41746 ERS Planned Pipeline Pigging Completed (High Pressure)(05.28.2025-05.30.2025)
CRITICAL 05/23/25 05/23/25 08/31/25 41726 Carbide Compressor Station Planned Maintenance (High Pressure) (06.26.2025)
CRITICAL 05/22/25 05/22/25 08/31/25 41706 ERS Planned Pipeline Pigging (High Pressure) Update
CRITICAL 05/19/25 05/19/25 08/31/25 41647 Belmont Gathering System High Pressure Advisory [06-18-25]
CRITICAL 05/19/25 05/19/25 08/31/25 41646 Fortress Compressor Station Maintenance [06-18-25]
CRITICAL 05/16/25 05/16/25 08/31/25 41606 Carbide Compressor Station Planned Maintenance Completed (High Pressure)(05.15.2025)
CRITICAL 05/15/25 05/15/25 08/31/25 41546 Titan Compressor Station Maintenance [06-11-25]
CRITICAL 05/15/25 05/15/25 08/31/25 41526 Cobra Compressor Station Maintenance [06-11-25]
CRITICAL 05/15/25 05/15/25 08/31/25 41506 Goliath Compressor Station Maintenance [06-11-25]
CRITICAL 05/15/25 05/15/25 08/31/25 41486 Cain Ridge Compressor Station Maintenance [06-10-25] UPDATE
CRITICAL 05/14/25 05/14/25 08/31/25 41467 Cain Ridge Compressor Station Maintenance [06-11-25]
CRITICAL 05/14/25 05/14/25 08/31/25 41466 Cain Ridge Compressor Station Maintenance [06-03-25]
CRITICAL 05/14/25 05/14/25 08/31/25 41446 EGTS-California 342 Interconnect Maintenance [06-11-25]
CRITICAL 05/14/25 05/14/25 08/31/25 41426 EGTS-California 342 Interconnect Maintenance [06-02-25]
CRITICAL 05/14/25 05/14/25 08/31/25 41386 Zink Compressor Station Maintenance [05-13-25] COMPLETE
CRITICAL 05/13/25 05/13/25 08/31/25 41366 EGTS-Lowman Ridge IC Maintenance Update (High Pressure)(05.16.2025-05.26.2025)
CRITICAL 05/09/25 05/09/25 08/31/25 41286 Carbide Compressor Station Planned Maintenance (High Pressure) (06.17.2025)
CRITICAL 05/01/25 05/01/25 07/31/25 41167 Cain Ridge Compressor Station Maintenance [04-29-25] COMPLETE
CRITICAL 05/01/25 05/01/25 08/31/25 41166 Carbide Compressor Station Planned Maintenance (High Pressure)(06.10.2025)
CRITICAL 04/28/25 04/28/25 07/31/25 41126 Zink Compressor Station Unplanned Outage [4-27-25] COMPLETE
CRITICAL 04/27/25 04/27/25 07/31/25 41106 Zink Compressor Station Unplanned Outage [4-27-25]
CRITICAL 04/24/25 04/24/25 07/31/25 41066 Cain Ridge Compressor Station Maintenance [04-22-25] COMPLETE
CRITICAL 04/23/25 04/23/25 07/31/25 41026 TCO-LXP Pigging 04-22-25 [Stagecoach] COMPLETE
CRITICAL 04/23/25 04/23/25 07/31/25 40986 TCO-LXP Pigging 04-22-25 [Eureka] COMPLETE
CRITICAL 04/17/25 04/17/25 07/31/25 40946 Rover-Clarington IC Maintenance [04-16-25]COMPLETE
CRITICAL 04/17/25 04/17/25 07/30/25 40927 TEP-REX Gunslinger IC Maintenance [04-16-25] COMPLETE
CRITICAL 04/17/25 04/17/25 07/31/25 40926 Pisces Compressor Station Planned Maintenance (High Pressure)(05.29.2025)
CRITICAL 04/16/25 04/16/25 07/31/25 40887 EGTS-Lowman Ridge IC Maintenance (High Pressure)(05.16.2025-05.26.2025)
CRITICAL 04/16/25 04/16/25 07/31/25 40886 Zink Compressor Station Maintenance [04-15-25] COMPLETE
CRITICAL 04/10/25 04/10/25 07/31/25 40828 Cain Ridge Compressor Station Maintenance [04-29-25]
CRITICAL 04/10/25 04/10/25 07/31/25 40827 Cain Ridge Compressor Station Maintenance [04-22-25] UPDATE
CRITICAL 04/10/25 04/10/25 07/31/25 40807 Zink Compressor Station Maintenance [05-13-25]
CRITICAL 04/10/25 04/10/25 07/31/25 40806 Carbide Compressor Station Planned Maintenance (High Pressure) (05.15.2025)
CRITICAL 04/09/25 04/09/25 07/31/25 40786 Great Hammerhead IC Planned Outage Complete (High Pressure)(04.09.2025)
CRITICAL 04/04/25 04/04/25 07/31/25 40746 Carbide Compressor Station Planned Maintenance Complete (High Pressure) (04.03.2025)
CRITICAL 04/03/25 04/03/25 07/31/25 40726 Rover-Clarington IC Maintenance [04-16-25]
CRITICAL 03/26/25 03/26/25 06/30/25 40626 Cain Ridge Compressor Station Maintenance [04-22-25]
CRITICAL 03/26/25 03/26/25 06/30/25 40586 Carbide Compressor Station Planned Maintenance Complete (High Pressure) (03.25.2025)
CRITICAL 03/21/25 03/21/25 06/30/25 40566 Zink Compressor Station Maintenance [03-19-25] Complete
CRITICAL 03/20/25 03/20/25 06/30/25 40546 TEP-REX Gunslinger IC Maintenance [04-16-25]
CRITICAL 03/19/25 03/19/25 06/30/25 40527 TCO-LXP Pigging 04-22-25 [Eureka] UPDATE
CRITICAL 03/19/25 03/19/25 06/30/25 40526 TCO-LXP Pigging 04-22-25 [Stagecoach] UPDATE
CRITICAL 03/19/25 03/19/25 06/30/25 40507 TCO-LXP Pigging 04-23-25 [Stagecoach]
CRITICAL 03/19/25 03/19/25 06/30/25 40506 TCO-LXP Pigging 04-23-25 [Eureka]
CRITICAL 03/19/25 03/19/25 06/30/25 40486 Zink Compressor Station Maintenance [03-18-25] COMPLETE
CRITICAL 03/19/25 03/19/25 06/30/25 40467 Cain Ridge Compressor Station Maintenance [03-18-25] COMPLETE
CRITICAL 03/19/25 03/19/25 06/30/25 40466 Carbide Compressor Station Planned Maintenance Complete (High Pressure) (03.18.2025)
CRITICAL 03/18/25 03/18/25 06/30/25 40446 Zink Compressor Station Maintenance [04-15-25]
CRITICAL 03/12/25 03/12/25 06/30/25 40386 Big Kahuna Compressor Station Maintenance [03-12-25] Complete
CRITICAL 03/07/25 03/07/25 06/30/25 40326 ET-WickIC Maintenance [03-06-25] Complete
CRITICAL 03/05/25 03/05/25 05/31/25 40286 Zink Compressor Station Maintenance [03-04-25] COMPLETE
CRITICAL 02/26/25 02/26/25 05/31/25 40206 ERS Planned Pipeline Pigging Completed (High Pressure)(02.25.2025-02.27.2025)
CRITICAL 02/26/25 02/26/25 05/31/25 40186 Carbide Compressor Station Planned Maintenance Complete (High Pressure) (02.05.2025)
CRITICAL 02/21/25 02/21/25 05/31/25 40086 Zink Compressor Station Maintenance [02-20-25] Complete
CRITICAL 02/20/25 02/20/25 05/31/25 40006 Carbide Compressor Station Planned Maintenance (High Pressure) (04.03.2025)
CRITICAL 02/17/25 02/17/25 05/31/25 39966 Cain Ridge Compressor Station Maintenance [03-18-25]
CRITICAL 02/17/25 02/17/25 05/31/25 39946 Zink Compressor Station Maintenance [03-18-25]
CRITICAL 02/17/25 02/17/25 05/31/25 39926 Zink Compressor Station Maintenance [03-19-25]
CRITICAL 02/17/25 02/17/25 05/31/25 39907 Carbide Compressor Station Planned Maintenance (High Pressure) (03.25.2025)
CRITICAL 02/17/25 02/17/25 05/31/25 39906 Carbide Compressor Station Planned Maintenance (High Pressure) (03.25.2025)
CRITICAL 02/14/25 02/14/25 05/31/25 39886 Carbide Compressor Station Unplanned Outage Complete (High Pressure) (02.13.2025)
CRITICAL 02/13/25 02/13/25 05/31/25 39786 ERS March Planned Pipeline Pigging (High Pressure)(03.04.2025)
CRITICAL 02/11/25 02/11/25 05/30/25 39766 Carbide Compressor Station Planned Maintenance (High Pressure) (03.18.2025)
CRITICAL 02/10/25 02/10/25 05/31/25 39746 Zink Compressor Station Maintenance [03-04-25]
CRITICAL 02/05/25 02/05/25 05/30/25 39666 Carbide Compressor Station Planned Maintenance Update (High Pressure) (02.05.2025)
CRITICAL 02/05/25 02/05/25 05/30/25 39646 ERS Planned Pipeline Pigging Completed (High Pressure)
CRITICAL 04/17/24 04/17/24 07/31/25 36106 Zink CS Maintenance [04/16] COMPLETE
CRITICAL 03/19/24 03/19/24 07/31/25 35686 Zink CS Maintenance [04/16]
CRITICAL 12/21/22 12/21/22 12/31/00 29206 Eureka Rich Gathering System (High Pressure) OPP Setpoint Changes
CRITICAL 12/02/22 12/02/22 12/31/00 29026 TCO Smithfield - Capacity Limitation
CRITICAL 11/02/22 11/02/22 12/31/00 28746 Equitrans Gathering Unplanned Pipeline Outage
CRITICAL 03/28/22 03/28/22 12/31/00 27148 H-8631 (Gzimish XS Station Area) Outage
CRITICAL 03/28/22 03/28/22 12/31/00 27147 Waynesburg Compressor Station Outage (Updated 3-28-22)
CRITICAL 03/15/22 03/15/22 12/31/00 27026 Waynesburg Compressor Station Outage (Updated 3-15-22)
CRITICAL 02/10/22 02/10/22 12/31/00 26770 Waynesburg Compressor Station Outage
CRITICAL 12/31/20 12/31/20 12/31/00 22487 Eureka Rich System Planned Pipeline Pigging Revision
CRITICAL 10/28/20 10/28/20 12/31/00 21746 Standard time notification
CRITICAL 09/12/20 09/12/20 12/31/00 21187 German Ridge Compressor Unplanned Maintenance
CRITICAL 09/12/20 09/12/20 12/31/00 21186 German Ridge Compressor Unplanned Maintenance
CRITICAL 09/11/20 09/11/20 12/31/00 21166 Operating condition notice - available capacity not to exceed scheduled quantities
CRITICAL 06/15/20 06/15/20 12/31/00 19810 Eureka Rich System Planned Pipeline Pigging Revision
CRITICAL 06/15/20 06/15/20 12/31/00 19809 Eureka Rich System - operating conditions
CRITICAL 06/03/20 06/03/20 12/31/00 19570 Eureka Rich System Planned Pipeline Pigging Revision
CRITICAL 06/03/20 06/03/20 12/31/00 19569 Eureka Rich System Planned Pipeline Pigging
CRITICAL 01/14/20 01/14/20 12/31/00 17766 EQM Olympus - Imbalance Payback
CRITICAL 12/31/19 12/31/19 12/31/00 17586 Belmont Imbalance Warning
CRITICAL 12/18/19 12/18/19 12/31/00 17466 Zink Capacity Update
CRITICAL 11/04/19 11/04/19 12/31/00 16821 Two-Factor Authentication - Cell Phone Number Request
CRITICAL 03/14/19 03/14/19 12/31/00 14064 Imbalance Warning Lifted
CRITICAL 03/09/19 03/09/19 12/31/00 13962 Imbalance Warning
CRITICAL 02/28/19 02/28/19 12/31/00 13881 Imbalance Warning
CRITICAL 01/17/19 01/17/19 12/31/00 13461 Imbalance Warning
CRITICAL 12/07/18 12/07/18 12/31/00 13001 Goliath & Godzilla Compressor Station Maint. Complete
CRITICAL 10/25/18 10/25/18 12/31/00 12461 Standard time notification
CRITICAL 10/15/18 10/15/18 12/31/00 12322 EQM Midstream Partners and the Customer Portal
CRITICAL 10/15/18 10/15/18 12/31/00 12304 EQM Midstream Partners and the Customer Portal
CRITICAL 09/28/18 09/28/18 12/31/00 12181 Imbalance Warning
CRITICAL 07/12/18 07/12/18 12/31/00 11301 TCO Force Majeure Update
CRITICAL 05/23/18 05/23/18 12/31/00 10602 Stagecoach - pipeline maintenance update
CRITICAL 05/22/18 05/22/18 12/31/00 10585 Stagecoach - pipeline maintenance
CRITICAL 05/19/18 05/19/18 12/31/00 10541 Stagecoach - pipeline maintenance
CRITICAL 01/22/18 01/22/18 12/31/00 9382 Belmont Longwall Mining - Update 2
CRITICAL 01/18/18 01/18/18 12/31/00 9341 Belmont Longwall Mining - Update 1
CRITICAL 08/18/17 08/18/17 12/31/00 7881 PEG-223 Pipeline Maint. Complete
CRITICAL 05/25/17 05/25/17 12/31/00 7181 DTI Hastings Extraction Plant Outage Update
CRITICAL 05/23/17 05/23/17 12/31/00 7143 PEG-185 Pipeline Maintenance
CRITICAL 05/17/17 05/17/17 12/31/00 7062 WL741073 pipeline - out of service
CRITICAL 03/03/17 03/03/17 12/31/00 6401 F-841 Pipeline Maintenance
CRITICAL 02/15/17 02/15/17 12/31/00 6222 PEG-1665 Pipeline Maint. Complete
CRITICAL 12/29/16 12/29/16 12/31/00 6082 PEG-1665 Pipeline Maintenance
CRITICAL 11/08/16 11/08/16 12/31/00 5741 F-810 Pipeline Maintenance Complete
CRITICAL 11/02/16 11/02/16 12/31/00 5661 F-1146 Pipeline Maintenance Complete
CRITICAL 11/02/16 11/02/16 12/31/00 5646 F-1146 Pipeline Maintenance Update
CRITICAL 11/02/16 11/02/16 12/31/00 5643 F-810 Pipeline Maintenance Update
CRITICAL 10/25/16 10/25/16 12/31/00 5561 PEG-187 Pipeline Maintenance Complete
CRITICAL 10/25/16 10/25/16 12/31/00 5541 F-810 Pipeline Maintenance
CRITICAL 10/06/16 10/06/16 12/31/00 5401 Benezette Compressor Station Outtage
CRITICAL 10/03/16 10/03/16 12/31/00 5381 PEG-187 Pipeline Maintenance
CRITICAL 10/03/16 10/03/16 12/31/00 5361 F-821 Pipeline Maintenance
CRITICAL 09/19/16 09/19/16 12/31/00 5161 W7519 Pipeline Maintenance
CRITICAL 09/29/16 09/29/16 12/31/00 5141 F-821 Pipeline Maintenance
CRITICAL 12/23/15 12/23/15 12/31/00 2181 Equitrans OFO
CRITICAL 12/17/15 12/17/15 12/31/00 2124 Equitrans OFO - Lifted
CRITICAL 12/09/15 12/09/15 12/31/00 2042 Equitrans OFO
CRITICAL 07/08/15 07/08/15 12/31/00 101 F-821 Pipeline Maint. updated
CRITICAL 05/23/12 05/23/12 12/31/00 61 HOW MUCH WOOD WOULD A WOODCHUCK CHUCK?
CRITICAL 05/22/12 05/22/12 12/31/00 41 QG NOTICE OF CURTAILMENT (MCL TEST)
CRITICAL 05/22/12 05/22/12 12/31/00 22 HEADER - NOTICE OF CURTAILMENT (MCL TEST)