Equitrans Gathering Notice 23406
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
04-19-2021 11:30:00
Page 1 of 1
System Wide Notice Detail
TSP Name:
ETRANSGATH
TSP:
Post Date/Time:
Mon Apr 19 11:30:00 GMT 2021
Subject:
Notice RE: Equitrans Gathering System Over Pressure Protection Certification
Notice Type:
OTHER
Notice ID:
23406
Notice Status Desc:
Initiate
Critical Desc:
Not a Critical Notice
Notice Eff Date:
04-19-2021
Notice Eff Time:
11:30:00
Notice End Date:
12-31-9000
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Effective July 1, 2021, all receipt points on the Equitrans gathering system which may continue to flow must have installed over pressure protection (OPP)
equipment which reflects a set point less than or equal to 21 pounds per square inch gauge (psig). Accordingly, please email Equitrans at
by May 24, 2021 to certify that all receipt points have installed OPP equipment that reflects a set point less
ETRNCommercialSvcs@equitransmidstream.com
than or equal to 21 psig. Those receipt points not certified as having installed OPP equipment with a set point less than or equal to 21 psig will be shut in and
locked out in order to maintain gathering system safety and operational integrity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name:
ETRANSGATH
TSP:
Post Date/Time:
Mon Apr 19 11:30:00 GMT 2021
Subject:
Notice RE: Equitrans Gathering System Over Pressure Protection Certification
Notice Type:
OTHER
Notice ID:
23406
Notice Status Desc:
Initiate
Critical Desc:
Not a Critical Notice
Notice Eff Date:
04-19-2021
Notice Eff Time:
11:30:00
Notice End Date:
12-31-9000
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Effective July 1, 2021, all receipt points on the Equitrans gathering system which may continue to flow must have installed over pressure protection (OPP)
equipment which reflects a set point less than or equal to 21 pounds per square inch gauge (psig). Accordingly, please email Equitrans at
Notice Text:
ETRNCommercialSvcs@equitransmidstream.com by May 24, 2021 to certify that all receipt points have installed OPP equipment that reflects a set point less
than or equal to 21 psig. Those receipt points not certified as having installed OPP equipment with a set point less than or equal to 21 psig will be shut in and
locked out in order to maintain gathering system safety and operational integrity.