Type | Posted | Effective | End | Identifier | Status | Subject | Response |
---|---|---|---|---|---|---|---|
Capacity Constraint | 08/08/25 | 08/09/25 | 08/10/25 | 166045 | TE Pipeline Conditions for 8/9/2025 | ||
Capacity Constraint | 08/08/25 | 08/08/25 | 11/06/25 | 166044 | New Roads Compressor Station Outage -- COMPLETE | ||
Capacity Constraint | 08/07/25 | 08/08/25 | 08/09/25 | 166004 | TE Pipeline Conditions for 8/8/2025 | ||
Operational Flow Order | 08/07/25 | 08/11/25 | 11/05/25 | 165971 | TE Operational Flow Order -- EFF 8/11 | ||
Capacity Constraint | 08/07/25 | 08/07/25 | 11/05/25 | 165978 | Somerset to Summerfield Line 3 Valve Section 3 Detailed Investigations -- COMPLETE | ||
Capacity Constraint | 08/06/25 | 08/07/25 | 08/08/25 | 165961 | TE Pipeline Conditions for 8/7/2025 | ||
Capacity Constraint | 08/06/25 | 08/06/25 | 08/07/25 | 165935 | TE Pipeline Conditions for 8/6/2025 -- INTRADAY | ||
Capacity Constraint | 08/05/25 | 08/06/25 | 08/07/25 | 165927 | TE Pipeline Conditions for 8/6/2025 | ||
Capacity Constraint | 08/05/25 | 08/05/25 | 11/03/25 | 165902 | TE Meter Underperformance | ||
Capacity Constraint | 08/05/25 | 08/05/25 | 11/03/25 | 165895 | Yazoo City Compressor Station Outage -- COMPLETE | ||
Capacity Constraint | 08/04/25 | 08/05/25 | 08/06/25 | 165889 | TE Pipeline Conditions for 8/5/2025 | ||
Operational Flow Order | 08/04/25 | 08/04/25 | 11/02/25 | 165858 | TE Operational Flow Order -- LIFTED EFF 8/4 | ||
Capacity Constraint | 08/03/25 | 08/04/25 | 08/05/25 | 165852 | TE Pipeline Conditions for 8/4/2025 | ||
Capacity Constraint | 08/02/25 | 08/03/25 | 08/04/25 | 165824 | TE Pipeline Conditions for 8/3/2025 | ||
Capacity Constraint | 08/01/25 | 08/02/25 | 08/03/25 | 165795 | TE Pipeline Conditions for 8/2/2025 | ||
Capacity Constraint | 07/31/25 | 08/01/25 | 08/02/25 | 165743 | TE Pipeline Conditions for 8/1/2025 | ||
Operational Flow Order | 07/31/25 | 08/02/25 | 08/04/25 | 165713 | TE Operational Flow Order -- EFF 8/2 | ||
Operational Flow Order | 07/31/25 | 08/01/25 | 10/29/25 | 165709 | TE Operational Flow Order -- LIFTED EFF 8/1 | ||
Capacity Constraint | 07/30/25 | 07/31/25 | 08/01/25 | 165704 | TE Pipeline Conditions for 7/31/2025 | ||
Capacity Constraint | 07/29/25 | 07/30/25 | 07/31/25 | 165647 | TE Pipeline Conditions for 7/30/2025 | ||
Capacity Constraint | 07/28/25 | 07/29/25 | 07/30/25 | 165624 | TE Pipeline Conditions for 7/29/2025 | ||
Capacity Constraint | 07/27/25 | 07/28/25 | 07/29/25 | 165576 | TE Pipeline Conditions for 7/28/2025 | ||
Capacity Constraint | 07/26/25 | 07/27/25 | 07/28/25 | 165546 | TE Pipeline Conditions for 7/27/2025 | ||
Capacity Constraint | 07/25/25 | 07/26/25 | 07/27/25 | 165510 | TE Pipeline Conditions for 7/26/2025 | ||
Capacity Constraint | 07/24/25 | 07/25/25 | 07/26/25 | 165484 | TE Pipeline Conditions for 7/25/2025 | ||
Operational Flow Order | 07/24/25 | 07/28/25 | 10/22/25 | 165451 | TE Operational Flow Order -- EFF 7/28 | ||
Capacity Constraint | 07/23/25 | 07/24/25 | 07/25/25 | 165446 | TE Pipeline Conditions for 7/24/2025 | ||
Operational Flow Order | 07/22/25 | 07/24/25 | 07/26/25 | 165383 | TE Operational Flow Order -- EFF 7/24 | ||
Capacity Constraint | 07/22/25 | 07/23/25 | 07/24/25 | 165391 | TE Pipeline Conditions for 7/23/2025 | ||
Capacity Constraint | 07/21/25 | 07/22/25 | 07/23/25 | 165373 | TE Pipeline Conditions for 7/22/2025 | ||
Computer System Status | 07/21/25 | 07/21/25 | 10/15/25 | 165239 | REMINDER TONIGHT: EDI Customers only - Enbridge EDI PGP Key Renewal Date (July 21,2025 at 10:15PM CST) | ||
Capacity Constraint | 07/20/25 | 07/21/25 | 07/22/25 | 165343 | TE Pipeline Conditions for 7/21/2025 | ||
Capacity Constraint | 07/19/25 | 07/20/25 | 07/21/25 | 165310 | TE Pipeline Conditions for 7/20/2025 | ||
Capacity Constraint | 07/18/25 | 07/19/25 | 07/20/25 | 165282 | TE Pipeline Conditions for 7/19/2025 | ||
Capacity Constraint | 07/17/25 | 07/18/25 | 07/19/25 | 165206 | TE Pipeline Conditions for 7/18/2025 | ||
Capacity Constraint | 07/16/25 | 07/17/25 | 07/18/25 | 165170 | TE Pipeline Conditions for 7/17/2025 | ||
Capacity Constraint | 07/15/25 | 07/16/25 | 07/17/25 | 165149 | TE Pipeline Conditions for 7/16/2025 | ||
Capacity Constraint | 07/14/25 | 07/15/25 | 07/16/25 | 165101 | TE Pipeline Conditions for 7/15/2025 | ||
Capacity Constraint | 07/13/25 | 07/14/25 | 07/15/25 | 165062 | TE Pipeline Conditions for 7/14/2025 | ||
Capacity Constraint | 07/12/25 | 07/13/25 | 07/14/25 | 165034 | TE Pipeline Conditions for 7/13/2025 | ||
Capacity Constraint | 07/11/25 | 07/12/25 | 07/13/25 | 165007 | TE Pipeline Conditions for 7/12/2025 | ||
Operational Flow Order | 07/11/25 | 07/11/25 | 10/09/25 | 165004 | TE Operational Flow Order -- LIFTED EFF IMM | ||
Capacity Constraint | 07/11/25 | 07/11/25 | 10/09/25 | 165003 | Huntsville to Lufkin Line 11 VS 3 - 6 Isolation -- COMPLETE | ||
Capacity Constraint | 07/10/25 | 07/11/25 | 07/12/25 | 164967 | TE Pipeline Conditions for 7/11/2025 | ||
Capacity Constraint | 07/09/25 | 07/10/25 | 07/11/25 | 164918 | TE Pipeline Conditions for 7/10/2025 | ||
Capacity Constraint | 07/08/25 | 07/09/25 | 07/10/25 | 164879 | TE Pipeline Conditions for 7/9/2025 | ||
Capacity Constraint | 07/07/25 | 07/08/25 | 07/09/25 | 164838 | TE Pipeline Conditions for 7/8/2025 | ||
Computer System Status | 07/07/25 | 07/21/25 | 07/22/25 | 164702 | REMINDER:EDI Customers only - Enbridge EDI PGP Key Renewal Date (July 21,2025 at 10:15PM CST) | ||
Capacity Constraint | 07/06/25 | 07/07/25 | 07/08/25 | 164821 | TE Pipeline Conditions for 7/7/2025 | ||
Capacity Constraint | 07/06/25 | 07/07/25 | 10/04/25 | 164795 | Athens Compressor Station Unplanned Outage -- UPDATE | ||
Capacity Constraint | 07/05/25 | 07/06/25 | 07/07/25 | 164793 | TE Pipeline Conditions for 7/6/2025 | ||
Force Majeure | 07/05/25 | 07/05/25 | 10/03/25 | 164789 | Athens Compressor Station Force Majeure | ||
Capacity Constraint | 07/05/25 | 07/05/25 | 10/03/25 | 164788 | Athens Compressor Station Unplanned Outage | ||
Capacity Constraint | 07/04/25 | 07/05/25 | 07/06/25 | 164759 | TE Pipeline Conditions for 7/5/2025 | ||
Capacity Constraint | 07/03/25 | 07/04/25 | 07/05/25 | 164733 | TE Pipeline Conditions for 7/4/2025 -- CORRECTION | ||
Capacity Constraint | 07/03/25 | 07/04/25 | 07/05/25 | 164715 | TE Pipeline Conditions for 7/4/2025 | ||
Operational Flow Order | 07/02/25 | 07/05/25 | 09/30/25 | 164665 | TE Operational Flow Order -- EFF 7/5 -- CORRECTION | ||
Operational Flow Order | 07/02/25 | 07/05/25 | 09/30/25 | 164631 | TE Operational Flow Order -- EFF 7/5 | ||
Capacity Constraint | 07/02/25 | 07/03/25 | 07/04/25 | 164642 | TE Pipeline Conditions for 7/3/2025 | ||
Capacity Constraint | 07/01/25 | 07/02/25 | 07/03/25 | 164601 | TE Pipeline Conditions for 7/2/2025 | ||
Capacity Constraint | 06/30/25 | 07/01/25 | 07/02/25 | 164581 | TE Pipeline Conditions for 7/1/2025 | ||
Capacity Constraint | 06/29/25 | 06/30/25 | 07/01/25 | 164531 | TE Pipeline Conditions for 6/30/2025 | ||
Capacity Constraint | 06/28/25 | 06/29/25 | 06/30/25 | 164518 | TE Pipeline Conditions for 6/29/2025 | ||
Capacity Constraint | 06/27/25 | 06/28/25 | 06/29/25 | 164476 | TE Pipeline Conditions for 6/28/2025 | ||
Capacity Constraint | 06/27/25 | 06/27/25 | 09/25/25 | 164474 | TE Operational Advisory (Access Area and Market Area Tab Pool Tolerance Adjustment) | ||
Capacity Constraint | 06/27/25 | 06/27/25 | 09/25/25 | 164465 | Five Points Compressor Station Outage -- COMPLETE | ||
Capacity Constraint | 06/27/25 | 06/27/25 | 09/25/25 | 164452 | East Calcasieu Station Outage -- COMPLETE | ||
Operational Flow Order | 06/26/25 | 06/28/25 | 06/30/25 | 164415 | TE Operational Flow Order -- EFF 6/28 | ||
Capacity Constraint | 06/26/25 | 06/27/25 | 06/28/25 | 164434 | TE Pipeline Conditions for 6/27/2025 | ||
Capacity Constraint | 06/25/25 | 06/26/25 | 06/27/25 | 164395 | TE Pipeline Conditions for 6/26/2025 | ||
Operational Flow Order | 06/25/25 | 06/26/25 | 09/23/25 | 164373 | TE Operational Flow Order -- LIFTED EFF 6/26 | ||
Capacity Constraint | 06/24/25 | 06/25/25 | 06/26/25 | 164363 | TE Pipeline Conditions for 6/25/2025 | ||
Capacity Constraint | 06/23/25 | 06/24/25 | 06/25/25 | 164319 | TE Pipeline Conditions for 6/24/2025 | ||
Capacity Constraint | 06/23/25 | 06/23/25 | 09/21/25 | 164291 | Atlanta to Hope Line 1 Valve Section 4 Investigations -- COMPLETE | ||
Capacity Constraint | 06/22/25 | 06/23/25 | 06/24/25 | 164245 | TE Pipeline Conditions for 6/23/2025 | ||
Capacity Constraint | 06/22/25 | 06/24/25 | 09/20/25 | 164230 | TE Operational Advisory (Access Area and Market Area Tab Pool Tolerance Adjustment) | ||
Capacity Constraint | 06/21/25 | 06/22/25 | 06/23/25 | 164211 | TE Pipeline Conditions for 6/22/2025 | ||
Capacity Constraint | 06/20/25 | 06/21/25 | 06/22/25 | 164193 | TE Pipeline Conditions for 6/21/2025 | ||
Operational Flow Order | 06/19/25 | 06/23/25 | 09/17/25 | 164106 | TE Operational Flow Order -- EFF 6/23 | ||
Capacity Constraint | 06/19/25 | 06/20/25 | 06/21/25 | 164135 | TE Pipeline Conditions for 6/20/2025 | ||
Capacity Constraint | 06/18/25 | 06/19/25 | 06/20/25 | 164099 | TE Pipeline Conditions for 6/19/2025 | ||
Capacity Constraint | 06/17/25 | 06/18/25 | 06/19/25 | 164060 | TE Pipeline Conditions for 6/18/2025 | ||
Capacity Constraint | 06/16/25 | 06/17/25 | 06/18/25 | 164014 | TE Pipeline Conditions for 6/17/2025 | ||
Computer System Status | 06/16/25 | 06/16/25 | 09/14/25 | 163982 | LINK System Maintenance is Complete | ||
Capacity Constraint | 06/15/25 | 06/15/25 | 09/13/25 | 163961 | Somerset Compressor Station Outage -- COMPLETE | ||
Capacity Constraint | 06/15/25 | 06/16/25 | 06/17/25 | 163948 | TE Pipeline Conditions for 6/16/2025 | ||
Capacity Constraint | 06/14/25 | 06/15/25 | 06/16/25 | 163928 | TE Pipeline Conditions for 6/15/2025 - CORRECTION | ||
Capacity Constraint | 06/14/25 | 06/15/25 | 06/16/25 | 163925 | TE Pipeline Conditions for 6/15/2025 | ||
Capacity Constraint | 06/13/25 | 06/14/25 | 06/15/25 | 163882 | TE Pipeline Conditions for 6/14/2025 | ||
Operational Flow Order | 06/12/25 | 06/12/25 | 06/16/25 | 163815 | TE Operational Flow Order -- EFF 6/14 | ||
Capacity Constraint | 06/12/25 | 06/13/25 | 06/14/25 | 163840 | TE Pipeline Conditions for 6/13/2025 | ||
Capacity Constraint | 06/11/25 | 06/12/25 | 06/13/25 | 163797 | TE Pipeline Conditions for 6/12/2025 | ||
Computer System Status | 06/11/25 | 06/13/25 | 06/16/25 | 163774 | LINK System Maintenance the weekend of June 13, 2025 | ||
Capacity Constraint | 06/10/25 | 06/11/25 | 06/12/25 | 163715 | TE Pipeline Conditions for 6/11/2025 | ||
Capacity Constraint | 06/10/25 | 06/10/25 | 06/11/25 | 163711 | TE Pipeline Conditions for 6/10/2025 -- INTRADAY | ||
Capacity Constraint | 06/09/25 | 06/10/25 | 06/11/25 | 163678 | TE Pipeline Conditions for 6/10/2025 | ||
Capacity Constraint | 06/08/25 | 06/09/25 | 06/10/25 | 163661 | TE Pipeline Conditions for 6/9/2025 | ||
Capacity Constraint | 06/07/25 | 06/08/25 | 06/09/25 | 163629 | TE Pipeline Conditions for 6/8/2025 | ||
Capacity Constraint | 06/06/25 | 06/07/25 | 06/08/25 | 163583 | TE Pipeline Conditions for 6/7/2025 | ||
Operational Flow Order | 06/05/25 | 06/07/25 | 09/03/25 | 163510 | TE Operational Flow Order -- EFF 6/7 | ||
Capacity Constraint | 06/05/25 | 06/06/25 | 06/07/25 | 163531 | TE Pipeline Conditions for 6/6/2025 | ||
Capacity Constraint | 06/04/25 | 06/05/25 | 06/06/25 | 163488 | TE Pipeline Conditions for 6/5/2025 | ||
Capacity Constraint | 06/03/25 | 06/04/25 | 06/05/25 | 163470 | TE Pipeline Conditions for 6/4/2025 | ||
Capacity Constraint | 06/02/25 | 06/03/25 | 06/04/25 | 163415 | TE Pipeline Conditions for 6/3/2025 | ||
Capacity Constraint | 06/01/25 | 06/02/25 | 06/03/25 | 163377 | TE Pipeline Conditions for 6/2/2025 | ||
Capacity Constraint | 05/31/25 | 06/01/25 | 06/02/25 | 163337 | TE Pipeline Conditions for 6/1/2025 | ||
Capacity Constraint | 05/30/25 | 05/31/25 | 06/01/25 | 163322 | TE Pipeline Conditions for 5/31/2025 | ||
Capacity Constraint | 05/30/25 | 05/30/25 | 08/28/25 | 163293 | Batesville to Lebanon Line 1 VS 5 Unplanned Outage -- COMPLETE | ||
Capacity Constraint | 05/30/25 | 05/30/25 | 08/28/25 | 163282 | DCP Wilcox Processing Plant | ||
Capacity Constraint | 05/29/25 | 05/30/25 | 05/31/25 | 163266 | TE Pipeline Conditions for 5/30/2025 | ||
Operational Flow Order | 05/29/25 | 05/29/25 | 08/27/25 | 163236 | TE Operational Flow Order -- EFF 5/31 | ||
Capacity Constraint | 05/28/25 | 05/29/25 | 05/30/25 | 163225 | TE Pipeline Conditions for 5/29/2025 | ||
Computer System Status | 05/28/25 | 06/13/25 | 06/16/25 | 163186 | LINK System Maintenance the weekend of June 13, 2025 | ||
Capacity Constraint | 05/27/25 | 05/28/25 | 05/29/25 | 163149 | TE Pipeline Conditions for 5/28/2025 | ||
Computer System Status | 05/27/25 | 07/21/25 | 07/22/25 | 162987 | EDI Customers only - Enbridge EDI PGP Key Renewal Date (July 21,2025 at 10:15PM CST) | ||
Capacity Constraint | 05/26/25 | 05/27/25 | 05/28/25 | 163108 | TE Pipeline Conditions for 5/27/2025 | ||
Capacity Constraint | 05/25/25 | 05/26/25 | 05/27/25 | 163092 | TE Pipeline Conditions for 5/26/2025 | ||
Capacity Constraint | 05/24/25 | 05/25/25 | 05/26/25 | 163045 | TE Pipeline Conditions for 5/25/2025 | ||
Capacity Constraint | 05/23/25 | 05/24/25 | 05/25/25 | 163010 | TE Pipeline Conditions for 5/24/2025 | ||
Capacity Constraint | 05/23/25 | 05/23/25 | 05/24/25 | 162999 | TE Pipeline Conditions for 5/23/2025 -- INTRADAY | ||
Operational Flow Order | 05/22/25 | 05/24/25 | 05/27/25 | 162920 | TE Operational Flow Order -- EFF 5/24 | ||
Capacity Constraint | 05/22/25 | 05/23/25 | 05/24/25 | 162944 | TE Pipeline Conditions for 5/23/2025 | ||
Capacity Constraint | 05/21/25 | 05/22/25 | 05/23/25 | 162902 | TE Pipeline Conditions for 5/22/2025 | ||
Capacity Constraint | 05/21/25 | 05/21/25 | 08/19/25 | 162882 | Heidlersburg to Marietta LN2 VS 1-4 Isolation -- COMPLETE | ||
Capacity Constraint | 05/20/25 | 05/21/25 | 05/22/25 | 162864 | TE Pipeline Conditions for 5/21/2025 | ||
Capacity Constraint | 05/19/25 | 05/20/25 | 05/21/25 | 162823 | TE Pipeline Conditions for 5/20/2025 | ||
Capacity Constraint | 05/19/25 | 05/19/25 | 08/17/25 | 162804 | Chambersburg to Heidlersburg Line 2 Valve Section 4 - 5 Isolation -- COMPLETE | ||
Operational Flow Order | 05/19/25 | 05/19/25 | 08/17/25 | 162794 | TE Operational Flow Order -- LIFTED EFF 5/19 | ||
Capacity Constraint | 05/18/25 | 05/19/25 | 05/20/25 | 162790 | TE Pipeline Conditions for 5/19/2025 | ||
Capacity Constraint | 05/17/25 | 05/18/25 | 05/19/25 | 162757 | TE Pipeline Conditions for 5/18/2025 | ||
Capacity Constraint | 05/16/25 | 05/17/25 | 05/18/25 | 162722 | TE Pipeline Conditions for 5/17/2025 | ||
Capacity Constraint | 05/16/25 | 05/16/25 | 08/14/25 | 162691 | Batesville to Lebanon Line 1 VS5 Unplanned Outage | ||
Capacity Constraint | 05/15/25 | 05/16/25 | 05/17/25 | 162667 | TE Pipeline Conditions for 5/16/2025 | ||
Operational Flow Order | 05/15/25 | 05/17/25 | 08/13/25 | 162639 | TE Operational Flow Order -- EFF 5/17 | ||
Capacity Constraint | 05/14/25 | 05/15/25 | 05/16/25 | 162636 | TE Pipeline Conditions for 5/15/2025 | ||
Capacity Constraint | 05/13/25 | 05/14/25 | 05/15/25 | 162600 | TE Pipeline Conditions for 5/14/2025 | ||
Capacity Constraint | 05/12/25 | 05/13/25 | 05/14/25 | 162555 | TE Pipeline Conditions for 5/13/2025 -- UPDATE | ||
Capacity Constraint | 05/12/25 | 05/13/25 | 05/14/25 | 162538 | TE Pipeline Conditions for 5/13/2025 | ||
Capacity Constraint | 05/12/25 | 05/12/25 | 08/10/25 | 162520 | Mt Belvieu to Vidor Line 16 Valve Section 8 Isolation -- COMPLETE | ||
Operational Flow Order | 05/12/25 | 05/12/25 | 08/10/25 | 162513 | TE Operational Flow Order -- LIFTED EFF 5/12 | ||
Capacity Constraint | 05/11/25 | 05/12/25 | 05/13/25 | 162509 | TE Pipeline Conditions for 5/12/2025 |